管理学报
  Jun. 13, 2025
Home |  About Journal  |  Editorial Board  |  Instruction  |  Subscriptions  |  Advertisement  |  Contacts Us  |  Chinese
J4  2010, Vol. 7 Issue (8): 1233-    DOI:
Current Issue| Next Issue| Archive| Adv Search |
Study on Critical Chain Scheduling Considering Resource Substitutability
 LIN Jing-Jing, ZHOU Guo-Hua, YANG Qin
Southwest Jiaotong University, Chengdu,  China

Download: PDF (145 KB)   HTML (1 KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  

The direct application of TOC to project management leds to the development of the ‘critical chain’ technique, and it has received wide attentions.Based on brief introduction to the critical chain, the paper argues that the influence of resource substitutability should be considered while identifying critical chain.The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward.Finally a scheduling example is given to prove the methods' validity.

Key wordscritical chain      resource      substitutability     
Received: 10 July 2009     
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
LIN Jing-Jing
ZHOU Guo-Hua
YANG Qin
Cite this article:   
LIN Jing-Jing,ZHOU Guo-Hua,YANG Qin. Study on Critical Chain Scheduling Considering Resource Substitutability[J]. J4, 2010, 7(8): 1233-.
URL:  
http://manu68.magtech.com.cn/Jwk_glxb/EN/     OR     http://manu68.magtech.com.cn/Jwk_glxb/EN/Y2010/V7/I8/1233
Copyright  ©  CHINESE JOURNAL OF MANAGEMENT
Support by Beijing Magtech Co.ltd   support@magtech.com.cn